Test interval

All questions related to installations, configurations and maintenance of Advanced Host Monitor (including additional tools such as RMA for Windows, RMA Manager, Web Servie, RCC).
Post Reply
hadassimeir
Posts: 8
Joined: Sun Jun 27, 2004 4:33 pm
Location: Israel
Contact:

Test interval

Post by hadassimeir »

Hello,

I have a problem with the test interval on a specific test.
It's set to 3 minutes but it keeps testing every 1 min'.
On the actions I have a "Change test interval" to 10 min' and than back to original value, but it ignores it and even when the test is bad it keeps testing every 1 min'!

Meir.
KS-Soft
Posts: 13012
Joined: Wed Apr 03, 2002 6:00 pm
Location: USA
Contact:

Post by KS-Soft »

Probably this test configred as Master test for some other items?

Regards
Alex
hadassimeir
Posts: 8
Joined: Sun Jun 27, 2004 4:33 pm
Location: Israel
Contact:

Post by hadassimeir »

Yes it does.
but why every 1 min'?
KS-Soft
Posts: 13012
Joined: Wed Apr 03, 2002 6:00 pm
Location: USA
Contact:

Post by KS-Soft »

Quote from the manual
"Consider status of the master test obsolete after N seconds" option
This parameter is used by the program to determine whether the Master test status is up-to-date. Before starting a dependent test HostMonitor checks the status values of the Master tests defined on it. The parameter mandates for how long a Master test status is considered to be current.
Option located on Behavior page in the Options dialog.

Regards
Alex
Post Reply