Hi Alex,
Is it possible to have tests without any scedule defined ? My requirement is to have a test which will be run by an operator through manual refresh as and when required. The test should be idle at other times (means without any schedule).
I would then group these tests in a folder and would like to just refresh the folder.
Highly appreciate.
Regards,
Arun
Test without schedule
- plambrecht
- Posts: 151
- Joined: Wed May 19, 2004 8:11 am
- Location: Belgium
- Contact:
Hi,
What about disabling an entire folder ?
When needed, you just enable the folder, and the test are ran immediatly...
btw, in v4.60, when I enable an entire folder, only 1/2 of the items are enabled. When I select the remaining test and enable the selected tests, only 1/2 are enabled...
Pieter
Sorry for the many posts today... I had a productive momemnt
What about disabling an entire folder ?
When needed, you just enable the folder, and the test are ran immediatly...
btw, in v4.60, when I enable an entire folder, only 1/2 of the items are enabled. When I select the remaining test and enable the selected tests, only 1/2 are enabled...
Pieter
Sorry for the many posts today... I had a productive momemnt

Yeah, it should workWhat about disabling an entire folder ?
When needed, you just enable the folder, and the test are ran immediatly...
I cannot reproduce this problem. You have used "Enable this folder" menu item?btw, in v4.60, when I enable an entire folder, only 1/2 of the items are enabled. When I select the remaining test and enable the selected tests, only 1/2 are enabled...
Regards