|
View previous topic :: View next topic |
Author |
Message |
joanfc
Joined: 08 Jul 2004 Posts: 1
|
Posted: Thu Jul 08, 2004 8:21 am Post subject: Dependency Test |
|
|
We are trying to get some "Test Status Control" but we are not able to get it. We are on a WAN and we need to test a central router and 8 remote routers. Our intention is to set the 8 remote router tests dependant on the central one and additionally do some more control:
- We have problems with our ISP.
- We are pinging each router 5 times when and OK status is when 80% or more of ping are good (4 pings).
- We are pinging each router every 30 seconds.
- On a Down status we need this Status to be kept until the next 5 tests are OK; if not, the status must remain DOWN (This is due to a problem with paquets lost)
Is it possible to do this all?
How could we do it?
Thanks in advance.
Joan. |
|
Back to top |
|
|
KS-Soft
Joined: 03 Apr 2002 Posts: 12795 Location: USA
|
Posted: Thu Jul 08, 2004 12:35 pm Post subject: |
|
|
If you want to send 5 packets, its not a problem. But you cannot setup different limits for up/down status. E.g. if 80% of returned packets considered as limit for UP status, 79% of returned packets will be considered as DOWN status.
So, you may easily setup HostMonitor to send 5 packets and set UP status when 4 (or 5) packets were received, set DOWN status when 3 (or less) packets were received.
But its hard to setup configuration that you want. You will need to create auxiliary test items, create scripts to enable/disable tests, .... it will be too complicated.
Regards
Alex |
|
Back to top |
|
|
|
|
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum
|
Powered by phpBB © 2001, 2005 phpBB Group
|